BUSINESS LINE


ALUMiC is a hybrid innovative modular integrated construction system, providing solutions for high rise buildings projects

>> More

Category

Application

Cooperation| Media| Contact us| Join us| Resource| Q&A
Cooperation| Media Channel| Contact us| Join us| Resource Sharing| Q&A
Copyright © 2020 AluHouse Technology(GD)Company Limited.粤ICP备17040565号

400-100-0289

Share to Wechat ×
Share to Tik Tok ×
Tips ×
Tips ×
Tips ×
ALUMiC ×

What is MiC?

Modular Integrated Construction (MiC) is an innovative construction method. By adopting the concept of “factory assembly followed by on-site installation”, MiC helps to ease some of the current challenges faced by the local construction industry. In this method, free-standing integrated modules (completed with finishes, fixtures and fittings) are manufactured and assembled in a factory. By transferring on-site construction processes to a controlled factory environment, buildings can be substantially completed off-site. The adverse impacts of weather conditions, scarce labour resources and site constraints can all be substantially reduced. MiC provides a great degree of production quality control, and can improve construction productivity, safety and sustainability.

Advantages of MiC

1-Shortens Construction Time

Saves total project construction time by about 30% on average

Shortens the production period by constructing different modules in parallel in the factory

Reduces impacts of adverse weather conditions on the construction period

2-Improves Working Environment & Site Safety

Protects workers against adverse weather

Reduces risk of fall of persons from height

Reduces risk of slipping and tripping of site personnel

3-Sustainability and Environmental Friendliness

Reduces dust and noise nuisance to the surrounding environment

Minimises construction waste

Improves construction waste management

4-High Construction Quality

Improves construction accuracy

Facilitates quality control through mass production of pre-tested prototype modules

Minimises errors in construction

5-Better Management

Improves management of stored materials

Enhances production management in a controlled factory environment

Provides flexibility in project scheduling